Lots more prep work, but getting closer!
| Original floor, under all the layers of glue and tile |
| Replaced flooring (was damaged in places) |
| Floor; duroc laid down (look for toilet drain in upper left corner) |
| left side of shower, with mixer and shower head |
| right side of shower, with niche |
| major patching where towel rack was |
| Shower drain pre-durock (photo from contractor) |
No comments:
Post a Comment