Tuesday, September 18, 2018

9.18.18

Lots more prep work, but getting closer!

Original floor, under all the layers of glue and tile


Replaced flooring (was damaged in places)


Floor; circle in bottom right corner is where toilet will go


Floor; duroc laid down (look for toilet drain in upper left corner)

left side of shower, with mixer and shower head

right side of shower, with niche

major patching where towel rack was

Shower drain pre-durock (photo from contractor)







No comments:

Post a Comment