House Remodel 2016: The Unpinkening
Wednesday, November 7, 2018
11.7.18
The second floor bathroom is only days away from being done.
Today the plumber came and connected everything.
The TP holder and towel racks were installed.
And the last pieces of tile were installed. Tomorrow is grouting and sealing.
(And it all passed inspection.)
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment