Wednesday, November 7, 2018

11.7.18

The second floor bathroom is only days away from being done.

Today the plumber came and connected everything.




The TP holder and towel racks were installed.





And the last pieces of tile were installed. Tomorrow is grouting and sealing.


(And it all passed inspection.)

No comments:

Post a Comment