Thursday, October 4, 2018

10.4.18

Though the contractor is on another job this week, the plumber came today and installed the faucet:

and the toilet (we got the kind that has two different flush volumes):



And the shower head and handle:


Greg and I painted the trim (still needs some touch-up) and the door, and it's a semi-usable bathroom again.


No comments:

Post a Comment