Though the contractor is on another job this week, the plumber came today and installed the faucet:
and the toilet (we got the kind that has two different flush volumes):
And the shower head and handle:
Greg and I painted the trim (still needs some touch-up) and the door, and it's a semi-usable bathroom again.
No comments:
Post a Comment